Company History

1972

  • Integrated operations of all four plants in July.

1974

  • Heavy Electricals (India) Ltd merged with BHEL in January.

1982

  • Entered non-power sectors to reduce dependence on power; developed electrical, electronic, mechanical equipment for transmission, transportation, oil and gas.

1991

  • Converted to public limited company on December 24.
  • Subdivided shares from Rs 1000 to Rs 10; allotted 244,760,000 equity shares.

1992

  • Disinvested 489,52,000 equity shares between January-February.
  • Commissioned 10 thermal sets, 2 gas sets, 11 hydro sets.
  • Completed first 500 KV 1500 MW HUDC transmission line Rihand-Delhi.
  • Completed contracts for 2x60 MW thermal sets in Malta and Cyprus.

1994

  • Commissioned two 250 MW sets in Maharashtra and one 500 MW boiler in Orissa.
  • Established Asia's largest fuel evaluation test facility at Tiruchi.
  • Commissioned ten industrial power plants adding 293 kW.
  • Developed photovoltaic systems, solar refrigerator, and 2x5 kW fuel cell module.

1995

  • Commissioned India's first 250 MW thermal unit at Dahanu, Maharashtra.

1996

  • Handed over 100th Electric Locomotive to Indian Railways.
  • Installed 250th Hydro set at Dhupdal-1; handed over 30 MW gas turbine in Oman.
  • Signed agreement with Indian Railways for 53 AC/DC locos.
  • Undertook projects including Indira Sugar, Kurichu, Ghanvi, Gumma, Kerala DG sets, HRSGs, transformers, motors.

1997

  • Incorporated JV Bhe-Ge Gas Turbine Services with GE.
  • Incorporated JV Powerplant Performance Improvement with Siemens AG.
  • Won national best exporter award for 1995-96.
  • Ruled JV with Skoda for electric trolley buses.
  • Commissioned Frame-6 gas turbine in Oman and supplied 14 MW marine turbine to Navy.
  • JVs with GE and Siemens on 50:50 basis.
  • Technical tie-up with Siemens for steam turbines and generators.
  • Undertook supply of 36 MW STG for RIL and others.

1998

  • Commissioned fifth 210 MW unit at Gandhinagar TPS.
  • Entered agreement with ISRO for solar panels.
  • Commissioned maiden unit of Kodasalli HEP Karnataka.
  • Supplied and commissioned hydro equipment for Chunchunakatte, Bhadra, Narayanpur HEPs.
  • Commissioned 250 MW thermal set at Kothagudem TPS.
  • Commissioned first 30 kW grid interactive solar PV plant at Bangalore.

1999

  • Synchronised fifth 210 MW unit at Raichur TPS in 29 months.
  • Commissioned desalination plant in Gulf of Mannar.
  • Entered technical collaboration with Babcock Borsig Power for once through boilers.

2000

  • Signed MoU with Bhakra Beas Management Board for renovation of hydro stations.
  • Entered infotech sector with dotcom for B2B services.
  • Setting up portal for electrical engineering solutions.
  • Manufacturing largest AFBC boilers for Jindal Steel.
  • Won top exporters award for 11th year.
  • Considering VRS for underperforming employees.
  • Planning expansion to east Europe and Africa.
  • Bagged Samman Patra award from Finance Ministry.
  • Electronics division got ISO 14001 certification.
  • Bagged Rs 295 cr contract for Advance Class Gas Turbine in Tamil Nadu.
  • Completed 430 MW Faridabad CCP project in 30 months.
  • Won Best Productivity Performance Award for 1997-98.
  • Commissioned first 150 MW hydro unit at Ranjit Sagar HEP.
  • Bagged order from IOC for co-generation at Haldia refinery.
  • Awarded by Indian National Suggestion Schemes Association.
  • Karnataka Power Corporation awarded Rs 365 cr for 210 MW at Raichur.
  • Developed ceramic disc insulators for 500 KV HVDC.
  • Tiruchi bagged Handa Rolling Trophy and Golden Key Award.
  • Open to equity stakes in power projects.
  • Haridwar Complex awarded Neyveli Lignite rolling trophy.

2001

  • Bagged Golden Peacock National Quality Award for second year.
  • Won order for fifth 250 MW unit at Suratgarh TPS Rajasthan.
  • BHEL-GE Gas Turbine Services commissioned refurbishment centre.
  • R&D developed 50 kW phosphoric acid fuel cell power pack.
  • Bagged Golden Trading House status.
  • Commissioned first hydro unit at Kurichu HEP Bhutan.
  • Set to commission first 500 MW unit at NTPC Simhadri ahead of schedule.
  • Awarded Rs 540 cr electro-mechanical order for Maheshwar hydel project.

2002

  • Awarded top exporters award by Engineering Export Promotion Council for 1999-2000.
  • Tied up with PFC for joint bids.
  • Tied up with Metso Automation for diagnostic center.
  • Received Rs 174 cr contract from CPCL for 40 MW co-generation plant.
  • Launched IT school with IIT-Madras in Tiruchi.
  • Struck Rs 51 cr order for transformers to Tala HEP Bhutan.
  • Bagged Rs 50 cr export order in Kazakhstan.
  • Bagged orders from RVUNL for 195 MW at Kota TPS and 75 MW Ramgarh.
  • Commenced research on IGCC technology.
  • Power Sector Northern Region unit bagged OHSAS-18001 and ISO-14001.
  • Signed MoU with ONGC for oil-field equipment.
  • Bagged generator order from Sirupur Paper Mills.
  • Got Rs 267 cr order from Oman.
  • Signed technical collaboration with TLT Germany for high-efficiency fans.
  • Tiruchi unit got best employer-employee award.
  • Launched Vendor information system.
  • Clinched Rs 230 cr order from ONGC.
  • Got Rs 63 cr contract from NTPC.
  • Got Rs 35 cr grid substation project from Rajasthan Electricity Board.
  • Tied up with Shree Industries for solar water heaters.
  • Launched 4th solar power plant in Lakshadweep.
  • Power generating sets awarded for excellent performance.
  • Electronics Division secured export contract for automation systems to Indonesia.
  • Electroporcelains Division received OHSAS-18001 certification.
  • Launched first Vessel Traffic Management System at New Mangalore port.
  • Got Rs 41 cr order from NPC.
  • Announced completion of 1000 MW Simhadri thermal power station.
  • Commissioned 50 kWp solar PV grid interactive plant at Neil Island.
  • Got Rs 80 cr contract from Hindalco.
  • Launched web pages for vendor base expansion for energy meters.
  • Five Tiruchi employees conferred Viswakarma Rastriya Puraskar.
  • Bagged Rs 1,425 cr order for two 210 MW sets in UP.
  • Received Rs 25 cr contract from PGCIL for 400 kV substation in Orissa.
  • Bagged Rs 15.5 cr order for STG for sugar co-generation in Karnataka.
  • Received order from Uttaranchal Power Corporation for grid station.
  • Received CII award as first PSU winner.
  • Got order from Sterlite Group for steam generator.
  • Bagged order from Uttaranchal Jal Vidyut Nigam for 304 MW Maneri Bhali Stage-II.
  • Obtained order from NHPC for 800 MW Parbati hydro project.

2003

  • Forayed into Operations & Maintenance of power plants.
  • Flagged off first indigenously manufactured advance class gas turbine to GSEC.
  • Tied up with Skodaexport for overseas projects.
  • Received order from Chincholi Sugar Mills.
  • Forged alliance with Anna University for research and training.
  • Commissioned solar PV systems for rural telephone in Gujarat.
  • Bagged 20 MW power plant order from IOC Mathura Refinery.
  • Bagged Rs 1,589 cr order from MPSEB for 600 MW thermal unit.
  • Tied up with TCS for IT solutions in power sector.
  • Teamed up with Alstom for NTPC Sipat project.
  • Developed Automated Storage and Retrieval System.
  • Exported advance class gas turbine to Oman.
  • Executed turnkey contract for DVC.
  • Deployed solar panels on Insat 3A and GSAT 2 satellites.
  • Secured Rs 40 cr order from JSPL Raigarh steel plant.
  • Got order from Delhi Transco for 220 KV substation.
  • Got Rs 475 cr order from IOC.
  • Signed MoU with NTPC for O&M and EPC.
  • Put 250 MW unit on full generation in record 12 hours.
  • Developed HVOF spray technique.
  • Bagged order for hydro turbine generator to Taiwan.
  • Awarded ISO 14001 and OHSAS 18001 certifications.
  • Bagged $4.5m order from Gujarat Ambuja Cements for 30 MW STG.
  • Got Rs 36.30 cr contract for sewage treatment from Chennai Metro.
  • Won Hind Zinc contract for 154 MW power plant.
  • Got Rs 188 cr order from Tata Power.
  • Signed MoU with NTPC for engineering service venture.
  • Obtained Rs 1,412 cr contract for 1000 MW Kahalgaon STPP.
  • Forged alliance with Nordex for wind energy pilot.
  • Bagged Rs 1,700 cr EPC contract for 500 MW Korba project.
  • Received Rs 16 cr orders from Tisco.
  • Bagged award for excellence in Electronics.
  • Got $22 mn hydro power order for 12 MW project in Mizoram.
  • Set up centre for excellence.
  • Won contract from Ambuja Cement.
  • Got Rs 2,700 cr orders from NTPC.
  • Acquired Rs 21 cr order from Navy.
  • Dr Hari Shankar Jain won National Design Award.

2004

  • Got Rs 20 cr compressor and drive turbine package contract.
  • Bagged Rs 599 cr order for 250 MW power project in Maharashtra.
  • Set up Centre of Excellence for simulators at corporate R&D.
  • Bagged Rs 197 cr power order from Gujarat Electricity Board.
  • Bagged Rs 36 cr order from Bhushan Steel.
  • Got order for hydro electric project in Chhattisgarh.
  • Delivered gas turbines to IOC.
  • Got Rs 333 cr order for 112 MW plant in Gujarat.
  • Changes in Directorate including new Chairman & Managing Director H W Bhatnagar.
  • Got Rs 160 cr order from ONGC for oil exploration equipment.
  • Achieved commissioning of 70 MW Advanced Class gas turbine in Oman.
  • Released PowerPac-G software with TCS.
  • Appointed Bollepalli Ramachandra Rao as Executive Director Hyderabad.
  • Bagged Rs 94 cr contract from SAIL for Rourkela compressor package.
  • Secured Rs 647 cr contract from MSEB for 250 MW unit.
  • Inked MoU with Oil India for land rigs upgradation.
  • Bagged Rs 80 cr export order from Petroleum Development Oman.
  • Bagged Rs 70 cr order from Punjab State Electricity Board for hydro project.
  • Bagged Rs 142 cr contract for 120 MW plant in Jammu and Kashmir.
  • Electronics division bagged order for solar PV cells to Italy.
  • Bagged Rs 80 cr order from PDO Oman for centrifugal gas compressor.
  • Won contract for five solar power plants in Sunderbans.
  • Joined UN Global Compact.
  • Bagged Rs 65 cr order from Power Grid for 400/220 kV substation.
  • Secured Rs 21 cr order for 40 MW STG from Shriram Vinyl.
  • Won Rs 2 cr order for disc insulators from Tyco Electronics.
  • Bagged order from SAIL for 15 MW captive power plant at Bhilai.
  • Appointed AK Puri as Chairman and Managing Director.
  • Bagged Rs 550 cr order for 330 MW gas-based plant in Rajasthan.
  • Joined hands with NTPC for 100 MW power plant in Haridwar.

2005

  • Delisted equity shares from Madras Stock Exchange effective January 19.
  • Delisted equity shares from Ahmedabad Stock Exchange effective January 28.
  • Entered MoU with REC for power generation solutions.
  • Bagged largest commercial order of Rs 90.58 cr for ASRS.
  • Appointed Dr V. Gopalakrishnan as Chief at Tiruchi.
  • Teamed up with NTPC for 100 MW IGCC power project.
  • Got two export orders from Oman.
  • Trichy and Bangalore plants won five National Safety Awards.
  • Opened 2nd unit at NTPC's Rihand station.
  • Signed technology transfer agreement with Alstom.

2006

  • Inked agreement with IIT Madras for new courses.
  • Bechtel signed Dabhol agreement.
  • Signed MoU with NIT Tiruchirapalli.
  • Targeted $1.7 bn contract in Bangladesh.
  • Got Rs 165 cr order from IOC for Haldia refinery power plant.

2007

  • Appointed N Gokulram as Part-time Official Director.
  • Vineet Nayyar ceased as Director.
  • Raised R&D spend to Rs 238 cr.
  • Won orders worth over Rs 2,900 cr for Jhajjar Super Thermal Power Project.
  • Signed MoU with NTPC for Joint Venture in EPC activities.
  • Won turnkey order for captive power plant at steel plant in West Bengal.
  • Signed Joint Venture agreement with NTPC.
  • Issued Bonus Shares in 1:1 ratio.

2008

  • Secured orders worth Rs 15,000 cr including MoU with TNEB for two 800 MW stations.
  • K Ravi Kumar entrusted with additional charge of Chairman and Managing Director.
  • Tied up with AP Genco for Vizag unit.
  • Secured Engineering Export Promotion Council's top export award for 18th year.
  • Secured Rs 140 cr contract for two gas turbine units in UAE.
  • Established fourth Centre of Excellence for Surface Engineering.
  • Won orders for main plant package at Jhajjar Super Thermal Power Project.
  • Received Rs 1,150 cr turnkey contract for 153 MW captive power plant from HMEL.
  • Got Rs 14.74 bn contract from NTPC.

2009

  • Bagged Rs 4,015 cr order from Hindalco for 900 MW captive power plant in Orissa.
  • Secured Rs 2,600 cr order from Hindal India Thermal Power Ltd for 1,200 MW power project.
  • Bagged Rs 1,300 cr order from NTECL for turbines at Vallur Thermal Power Project.
  • Appointed Shekhar Datta as Part-time Non-Official Director.
  • Appointed O. P. Bhutani as Director (Engineering, Research & Development).

2010

  • Bagged Rs 900 cr orders from ONGC for six on-shore oil rigs.
  • Bagged Rs 3,348 cr orders for 376 MW captive power plant at Paradip Refinery.
  • Bagged Rs 6,300 cr order for power plant in Karnataka.
  • Signed technology transfer agreement with Sheffield Forgemasters for forgings up to 1,000 MW.
  • Bagged Rs 2,665 cr order for 2x600 MW coal-based thermal power project from Dainik Bhaskar Power Limited.

2011

  • Bagged Rs 37,829 cr contract for 2x660 MW Supercritical Thermal Sets from Dainik Bhaskar Power Limited.
  • Bagged Rs 40,710 cr contract for 1,200 MW Thermal Power Plant from Singareni Collieries.
  • Employees won 8 Prime Minister's Shram Awards.
  • Employees won 5 Vishwakarma National Awards; Units bagged 3 National Safety Awards.
  • Split face value of shares from Rs 10 to Rs 2.

2012

  • Commissioned India's first Ultra High Voltage AC 1200 kV Transformer.
  • Paid 136% Interim Dividend for fiscal 2011-12.
  • Signed Rs 6,300 cr contract with Abhijeet Projects for 300 MW Thermal Power Plant in Visakhapatnam.
  • Won SCOPE Meritorious Award for Best Practices in HR Management.
  • Bagged contract for 160 MW Combined Cycle Power Plant at Ramgarh, Rajasthan.
  • Won Rs 1,143 cr order from NTPC for 500 MW thermal unit at Vindhyachal.
  • Received Rs 9,500 cr contract for 1,020 MW Hydroelectric Project in Bhutan.
  • Signed MoU with Govt. of Tajikistan for 100 MW Hydro-Electric Power Project.
  • Paid 320% Equity Dividend for fiscal 2011-12.
  • CMD B.P. Rao won Power Man of the Year Award.
  • Received National Energy Conservation Award 2012.

2013

  • Won Rs 2,650 cr contract from BPCL for Kochi Refinery project.
  • Won ICAI National Award for Excellence in Cost Management for eighth year.
  • BHPV merged with BHEL as seventeenth unit.
  • Won Rs 25,690 cr Steam Generator Package Contract for 2x500 MW Lignite-fired Power Project.
  • Bagged main plant package contract for 500 MW thermal power plant.
  • Conferred BGR-ENERTIA Award for Technology Enterprise Innovation.
  • Commissioned first Supercritical Thermal Unit at Barh, adding 660 MW.
  • Bagged PSE Excellence Award for R&D, Technology Development and Innovation.
  • Won India Pride Award for Excellence in Heavy Industries.
  • Won Rs 10,230 cr Turbine generator package order.

2014

  • Won order for 206 MW Hydro Electric Project in Punjab.
  • Won Highest ever Mega EPC Contract for 3x660 MW Supercritical Power Project.
  • Bagged Rs 30,000 cr mega contract for 2x800 MW Supercritical Boilers.
  • Won order for 120 MW Hydro Electric Project in Uttarakhand.
  • Won DSIJ Award for Most Efficient Maharatna PSU.
  • Bagged National Intellectual Property Award.
  • Signed MoU for Renewable Energy Projects in Yemen.
  • Bagged WIPO Award for Innovative Enterprises.
  • Commissioned Gas Turbine-based Power Plant in Oman.
  • Commissioned 600 MW Thermal Unit in Odisha.
  • Overhauled 104 MW Gas Turbine Generator Unit 1 at Pragati Power Project.
  • Commissioned 250 MW Coal-based thermal power plant at Chhabra, Rajasthan.
  • Achieved R&M and Uprating of 110 MW Unit, extending life by 15-20 years.
  • Bagged India Today Best Maharatna PSU Awards for Global Presence and Innovation & R&D.
  • Won first EPC contract for 800 MW Supercritical Power Project.
  • Bagged EPC contract for 2x660 MW Supercritical Power Project.
  • Won order for 444 MW Hydro Electric Project in Uttarakhand.
  • Won contract for ESP package for 2x800 MW Darlipali Supercritical Thermal Power Project.
  • Achieved R&M of 110 MW Unit at Muzaffarpur Thermal Power Station.
  • Won ICAI National Award for Excellence in Cost Management for ninth year.
  • Bagged PSE Excellence Award for R&D and Technology Development.

2015

  • Commissioned fourth 270 MW coal based thermal power plant at RattanIndia Power Limited, Nandgaonpeth, Maharashtra.
  • Bagged contract for 1,080 MW Manuguru Thermal Power Project from TSGENCO.
  • Secured Rs 5,000 cr order for 4x270 MW thermal power plant in Telangana.
  • President of Rwanda inaugurated Hydro Electric Plant set up by BHEL.
  • Commissioned 28 MW Nyaborongo-1 hydro electric power plant in Rwanda.
  • Won Rs 225 cr order for 120 MW Hydro Electric Project in West Bengal.
  • Commissioned 660 MW Supercritical Thermal Unit in Bihar.
  • Commissioned another 270 MW Thermal Unit in Maharashtra.
  • Won Rs 3,810 cr order for 1x800 MW Supercritical Thermal power plant in Telangana.
  • Won Power Cycle Piping package contract for NTPC's 3x660 MW Barh Super Thermal Power Project.
  • Bagged Rs 1,202 cr order for 370 MW Gas-based Combined Cycle Power Project.
  • Secured single largest order worth Rs 17,950 cr.
  • Inked MoU with INTMA for gas-based power project in Kazakhstan.
  • Signed three strategic MoUs with Kazakhstan companies.

2016

  • Commissioned 600 MW Thermal Unit in Telangana.
  • Commissioned two 220/20kV substations in Afghanistan.
  • Commissioned 2nd 660 MW Supercritical Thermal unit in UP.
  • Bagged Rs 2,759 cr order for 800 MW unit in Tamil Nadu.
  • Commissioned 270 MW coal-based power project in Punjab.
  • Started 40 MW hydro power plant in West Bengal.
  • Bagged Rs 5,600 cr order for 1,600 MW Supercritical Power Project in Tamil Nadu.
  • Commissioned first 700 MW thermal unit in Karnataka.
  • Commissioned 600 MW thermal power plant in MP.
  • Started another 520 MW thermal power unit in AP.
  • Commissioned 500 MW Thermal Unit in Chhattisgarh.
  • Commissioned first unit of Pulichintala HEP in Telangana.

2017

  • Commissioned coal-fired Power Project in Indonesia.
  • Bagged R&M order for ESP Package at Kahalgaon Super Thermal Power Station in Bihar.
  • Bagged Rs 64 cr order for decentralised Sewage Treatment Plants.
  • Won largest value EPC order for 765 kV Substation.
  • Celebrated Utkrishthta Utsav and presented Excel Awards.
  • Received Vayoshreshtha Samman 2017 from President of India.
  • Won Six National Safety Awards.
  • Employees won maximum Vishwakarma Rashtriya Puraskars; Units got 6 National Safety Awards.
  • Bagged PSE Excellence Awards for R&D, HR, and Women Contribution.
  • Commissioned 30 MW Hydel Power Project in Mizoram.
  • Forayed into Chile and Estonia.
  • Won ICAI National Award for Excellence in Cost Management.
  • Signed Technology Collaboration Agreement with Kawasaki Heavy Industries for Stainless Steel Metro Coaches.
  • Bagged EPC order for 15 MW Solar Photovoltaic Power Plant.
  • Solar PV Portfolio reached 370 MW.
  • Commissioned 3 MW Solar Photovoltaic Power Plant.
  • Surpassed Government 12th Plan Capacity Addition Target.
  • Signed MoU with NEERI for water and waste water treatment projects.
  • Ranked only PSU in Top 25 Best Companies to Work For in India.
  • Won Golden Peacock HR Excellence award.
  • Celebrated BHEL Day.
  • Adjudged Best Power Equipment Manufacturing Organisation.
  • To build EHV substations for India's largest Ultra Mega Solar Park.

2018

  • Commissioned 250 MW thermal power unit in Bihar.
  • Bagged Rs 2,800 cr order for power project in Maharashtra.
  • Bagged Rs 560 cr order from NTPC.
  • Commissioned 18 MW hydro-electric project in Punjab.
  • Bagged thermal power project in Jharkhand.
  • Secured Rs 736 cr order for Nuclear Steam Generators.
  • Commissioned 600 MW thermal power plant in AP.
  • Won EPC order for 75 MW Solar Photovoltaic Plant.
  • Forayed into lake purification business under smart city initiative.
  • Won Rs 137 cr order for renovation in Telangana.
  • Entered metro rail coaches development business.
  • Entered into TCA with NANO.

2019

  • Bagged 2 orders worth Rs 97 crore from NPCIL.
  • Bagged first rail electrification order worth Rs 350 cr.
  • Received DSIJ Award for outstanding performance.
  • Bagged Rs 800 cr EPC orders for 200 MW Solar Power Plants.
  • Signed agreement with CONCOR to form Joint Working Group.
  • Tied up with CONCOR for rail-based logistics terminal at Haridwar.
  • Bagged Rs 100 crore EPC order for 25 MW solar power plant.
  • Commissioned unit of Kaleshwaram irrigation project in Telangana.

2020

  • Commissioned two hydro power generating units in Arunachal Pradesh.
  • Signed pact with Russian firm for defence projects.
  • Began civil works at 660-MW Sagardighi power plant in West Bengal.
  • Tied up with SwissRapide AG for Maglev trains.
  • Manufactured India's highest rating Auto Transformer.

2021

  • Won Clarivate South and South East Asia Innovation Award for Most Innovative Company.
  • Commissioned 800 MW unit at Gadarwara project in Madhya Pradesh.
  • Lit up boiler at 800 MW North Chennai Thermal Power Station.
  • Bagged major order for Sulphur Recovery Unit from Indian Oil.
  • Bagged Rs 1,045 cr order for nuclear steam generators from NPCIL.
  • Commissioned third renovated Hydro unit at 3x60 MW Baira Siul HEP.
  • Commissioned India’s largest floating Solar PV plant.

2022

  • Received CII-EXIM Bank Awards for Business Excellence.
  • Won order for Compressor Package from Iraq.
  • Signed MoU with RVNL.
  • Entered into Technology License Agreement with Sumitomo.

2023

  • Won CII-EXIM Bank Award for Business Excellence.
  • Won order for country’s largest capacity Hydro Project against International Competitive Bidding.
  • Successfully synchronised 660 MW unit of Maitree Super Thermal Power Project in Bangladesh.
  • Signed MoU with Greenstat Hydrogen India Pvt. Ltd. for Green Hydrogen and Derivatives.
  • Extended cooperation with General Electric for Gas Turbines.

2024

  • Secured order for 800kV, 6000 MW Khavda-Nagpur LCC HVDC Terminal Stations along with AC Transmission systems at Khavda.
  • Received Rajbhasha Kirti Puraskar.
  • Secured order for 2x800 MW Koderma Supercritical Thermal Power Project.
  • Bagged two back-to-back orders for 2x800 MW Raipur and 2x800 MW Mirzapur Supercritical Thermal Power Plants.
  • Bagged order for Haryana’s first 800 MW Ultra Supercritical Thermal Power Plant in Yamunanagar.

2025

  • Secured Rs 6,650 cr EPC order from NTPC for 800 MW Darlipali Thermal Power Project.
  • Bagged Rs 22.87 cr order from Indian Railways for Kavach Safety System.
  • Bagged Rs 11,800 cr order from Chhattisgarh genco.
  • Bagged order for boiler package at Raghunathpur thermal plant.
  • Received Letter of Award from MAHAGENCO for 2x660 MW BTG package of Koradi Thermal Power Station.

Open Your Free Demat Account Now!

Step into a world of zero fees and limitless opportunities!

pocketful logo

2022-25 Pocketful. All rights reserved, Built with in India

Version -5.76

app image 1app image 2

Explore

Calculatorsfooter arrow down icon
Popular Calculatorsfooter arrow down icon
Group Stocksfooter arrow down icon

Pocketful Fintech Capital Private Limited (CIN U65999DL2021PTC390548) | The SEBI Registration No. allotted to us is INZ000313732. NSE Member Code: 90326 | BSE Member Code: 6808 | MCX Member Code: 57120 DP | CDSL: 12099800